I-275 (SR-93) SB over US-92 (DALE MABRY HWY)

1.3 MI W/O N ARMENIA AVE · County 057, Florida · Built 2014 · 5 Lanes · 105,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
100825
Year Built
2014
Length
69.3 m (227.4 ft)
Max Span
34.8 m
Width
26.2 m (86 ft)
Lanes
5
Daily Traffic
105,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.