I-75 NB over US-301 (SR-43)

2MI SOUTH OF SR-618 · County 057, Florida · Built 1985 · 5 Lanes · 78,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
100486
Year Built
1985
Length
97.5 m (319.9 ft)
Max Span
34.6 m
Width
25.3 m (83 ft)
Lanes
5
Daily Traffic
78,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.