I-75 SB over US-301/SR-43
2MI SOUTH OF SR-618 · County 057, Florida · Built 1985 · 4 Lanes · 78,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
27.903636, -82.343833
This bridge is in worse condition than 22.5% of bridges in County 057. The average bridge in Florida is 0 years old; this one is 41 years old.
Nearby Bridges
US 301 TO I-75 NB over I-75NB - SR618WB
Built 1985
I-75 NB over US-301 (SR-43)
Built 1985
I-75NB TO US-301NB over US-301/SR-43
Built 1984
I-75 SB TO 301 SB over US-301 (SR-43)
Built 1984
US-301 (SR-43) over ARCHIE CREEK
Built 1985
I-75 over ARCHIE CREEK
Built 1985
PROGRESS BLVD. over BLOOMINGDALE CREEK
Built 1971
CR676A PROGRESS BD over I-75 (SR-93)
Built 1984
FALKENBURG RD over NORTH ARCHIE CREEK
Built 1997
FALKENBURG RD over LATERAL F CANAL
Built 1999
Bridge Details
- Structure #
- 100485
- Year Built
- 1985
- Length
- 97.5 m (319.9 ft)
- Max Span
- 34.6 m
- Width
- 21.8 m (71.5 ft)
- Lanes
- 4
- Daily Traffic
- 78,500
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $10,000
- Total Project Cost
- $11,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.