I-275 over SR-579/FLETCHER AVE

1MI NORTH OF SR-582 · County 057, Florida · Built 1966 · 6 Lanes · 124,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
100236
Year Built
1966
Reconstructed
2002
Length
42.8 m (140.4 ft)
Max Span
22.9 m
Width
34.7 m (113.8 ft)
Lanes
6
Daily Traffic
124,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.