I-275 NB & SB over SR-580 and CSX RR

0.9 MI. N OF HILLS. RIVER · County 057, Florida · Built 1967 · 8 Lanes · 151,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
100226
Year Built
1967
Reconstructed
2001
Length
83.2 m (273 ft)
Max Span
28.7 m
Width
40.2 m (131.9 ft)
Lanes
8
Daily Traffic
151,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,000
Total Project Cost
$9,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.