I-275 (SR-93) over HILLSBOROUGH RIVER

1.7 MI NORTH OF US-92 · County 057, Florida · Built 1967 · 8 Lanes · 181,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
100218
Year Built
1967
Reconstructed
2014
Length
91.5 m (300.2 ft)
Max Span
18.4 m
Width
49.7 m (163.1 ft)
Lanes
8
Daily Traffic
181,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.