I-75 (SR-93) NB over US-98/SR-50/SR-700

8.4 MI N/O CR-41/BLANTON · County 053, Florida · Built 2018 · 3 Lanes · 55,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
080087
Year Built
2018
Length
91 m (298.6 ft)
Max Span
91 m
Width
18 m (59.1 ft)
Lanes
3
Daily Traffic
55,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.