US-98 EB (SR-50EB) over WITHLACOOCHEE RIVER

1.6MI EAST OF I-75 · County 053, Florida · Built 1998 · 3 Lanes · 22,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
080064
Year Built
1998
Reconstructed
2021
Length
73.4 m (240.8 ft)
Max Span
14.7 m
Width
21.4 m (70.2 ft)
Lanes
3
Daily Traffic
22,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.