SR-80 (WB) over C-3 CANAL
10.5 MI E/O SR-29 · County 051, Florida · Built 2019 · 2 Lanes · 7,250 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
26.768444, -81.271667
This bridge is in worse condition than 44.8% of bridges in County 051. The average bridge in Florida is 0 years old; this one is 7 years old.
Nearby Bridges
SYCAMORE ROAD over CANAL 3
Built 1994
SR-80 over LONG HAMMOCK CREEK
Built 1999
SE BANYON BLVD over CANAL 3
Built 1994
SR-80 over GOODNO DRAINAGE CANAL
Built 2018
SR-80 WB over GOODNO DRAINAGE CANAL
Built 2020
SR-80 WB over LONG HAMMER CR Canal C-4
Built 2018
SR-80 EB over LONG HAMMER CREEK
Built 1983
RECREATION ACCESS over TRIBUTARY - CANAL 43
Built 1965
SR-78 over CITRUS CENTER CANAL
Built 1951
SR-80 WB over C-1 CANAL
Built 2013
Bridge Details
- Structure #
- 070088
- Year Built
- 2019
- Length
- 57.2 m (187.7 ft)
- Max Span
- 11.4 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 7,250
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.