SR-80 WB over GOODNO DRAINAGE CANAL

8.3MI E/O SR-29 · County 051, Florida · Built 2020 · 2 Lanes · 7,250 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
070086
Year Built
2020
Length
25.6 m (84 ft)
Max Span
8.5 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
7,250
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.