GLDEN GT PKY CR886 over SANTA BARBARA CANAL

1.54 MI E/O I-75 · County 021, Florida · Built 2024 · 4 Lanes · 52,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
034845
Year Built
2024
Length
34.2 m (112.2 ft)
Max Span
11.8 m
Width
29.9 m (98.1 ft)
Lanes
4
Daily Traffic
52,000
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.