CR-846 over DRAINAGE CANAL

4.5 MILES E OF SR-29 · County 021, Florida · Built 2024 · 2 Lanes · 3,200 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 9 Excellent

Location

26.418833, -81.339444

This bridge is in worse condition than 13.4% of bridges in County 021. The average bridge in Florida is 0 years old; this one is 2 years old.

Nearby Bridges

Bridge Details

Structure #
034833
Year Built
2024
Length
35.1 m (115.2 ft)
Max Span
12.2 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
3,200
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.