GOLDEN GATE BLVD over MILLER CANAL

7.9 MI E/O CR-951 · County 021, Florida · Built 2013 · 4 Lanes · 20,628 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
034804
Year Built
2013
Reconstructed
2019
Length
30.8 m (101 ft)
Max Span
10.2 m
Width
29.5 m (96.8 ft)
Lanes
4
Daily Traffic
20,628
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.