PARK SHORE DR over MOORING BAY

0.8 MI W/O US-41 · County 021, Florida · Built 1957 · 2 Lanes · 16,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
034101
Year Built
1957
Reconstructed
2004
Length
48.8 m (160.1 ft)
Max Span
12.2 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
16,500
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$843,000
Total Project Cost
$1,159,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.