SR-29 over I-75 (SR-93)

21 MI E/O CR951 · County 021, Florida · Built 1992 · 2 Lanes · 1,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
030291
Year Built
1992
Length
77.9 m (255.6 ft)
Max Span
39 m
Width
20.9 m (68.6 ft)
Lanes
2
Daily Traffic
1,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.