I-75 NB over WILDLIFE CROSSING NO 16

5.4 MI E OF SR-29 (MM75) · County 021, Florida · Built 1991 · 2 Lanes · 27,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
030246
Year Built
1991
Length
36.6 m (120.1 ft)
Max Span
12.2 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
27,500
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.