I-75 SB (SR-93) over Wildlife Crossing 215

7.3MI W OF SR-29 MM87.8 · County 021, Florida · Built 1990 · 2 Lanes · 13,426 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
030215
Year Built
1990
Length
36.6 m (120.1 ft)
Max Span
12.2 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
13,426
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.