US-41 (SR-90) over Canal 091

11.9 MI E OF SR-29 · County 021, Florida · Built 1949 · 2 Lanes · 3,515 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
030091
Year Built
1949
Reconstructed
1956
Length
9.2 m (30.2 ft)
Max Span
4.6 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
3,515
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$11,000
Total Project Cost
$16,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.