I-75 (SR-93) over PEACE RIVER

0.75 MI N OF US-17 · County 015, Florida · Built 2003 · 6 Lanes · 82,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
010106
Year Built
2003
Length
2451.6 m (8043.3 ft)
Max Span
32 m
Width
35.7 m (117.1 ft)
Lanes
6
Daily Traffic
82,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.