I-75 (SR-93) SB over RVRSIDE DR & SEM GLF RR

0.1MI NORTH OF US-17 · County 015, Florida · Built 1975 · 4 Lanes · 34,250 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
010080
Year Built
1975
Reconstructed
2018
Length
65.2 m (213.9 ft)
Max Span
24.7 m
Width
22.2 m (72.8 ft)
Lanes
4
Daily Traffic
34,250
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.