ARLINGTON BLVD (U. over GWMP (SB) & BOUNDARY CHA

1.6 MILES NORTH OF I-395. · County 001, District of Columbia · Built 1946 · 1 Lanes · 10,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
3300014P0000000
Year Built
1946
Reconstructed
1966
Length
81.4 m (267.1 ft)
Max Span
32.9 m
Width
26.6 m (87.3 ft)
Lanes
1
Daily Traffic
10,600
Material
Steel
Design
Girder and Floorbeam System
Owner
National Park Service
Last Inspected
N/A
Est. Improvement
$160,000
Total Project Cost
$240,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.