ARLINGTON BLVD. EB over ROUTE 110

01.25FR10TH/00.90TO23RD · County 013, Virginia · Built 1965 · 4 Lanes · 21,571 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000000172
Year Built
1965
Length
35.4 m (116.1 ft)
Max Span
18.3 m
Width
18.9 m (62 ft)
Lanes
4
Daily Traffic
21,571
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$220,000,000
Total Project Cost
$250,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.