ANACOSTIA FREEWAY over Bicycle and Pedestrian

Anacostia Freeway over · County 001, District of Columbia · Built 2022 · 1 Lanes · 8,400 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
1009-2
Year Built
2022
Length
8.1 m (26.6 ft)
Max Span
8.1 m
Width
9.9 m (32.5 ft)
Lanes
1
Daily Traffic
8,400
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.