ANACOSTIA FREEWAY over HOWARD RD S.E.
ANACOSTIA OVER HOWARD RD · County 001, District of Columbia · Built 1964 · 8 Lanes · 95,000 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
38.863572, -76.996858
This bridge is in worse condition than 5.7% of bridges in County 001. The average bridge in District of Columbia is 0 years old; this one is 62 years old.
Nearby Bridges
ANACOSTIA FREEWAY over HOWARD RD S.E.
Built 2022
ANACOSTIA FREEWAY over SUITLAND PKWY S.E.
Built 1964
ANACOSTIA FREEWAY over Bicycle and Pedestrian
Built 2022
ANACOSTIA FREEWAY over FIRTH STERLING AVE
Built 2022
I-295 over Good Hope Road
Built 2012
11th Street S.E. over Abandoned Railroad
Built 2012
Anacostia Freeway over Good Hope Road
Built 1964
SB I-295 over NB I-295
Built 2012
SB I-695 over I-295 Ramps
Built 2012
11th Street S.E. over Anacostia River
Built 2012
Bridge Details
- Structure #
- 1008
- Year Built
- 1964
- Length
- 33.1 m (108.6 ft)
- Max Span
- 30.6 m
- Width
- 50.5 m (165.7 ft)
- Lanes
- 8
- Daily Traffic
- 95,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,500,000
- Total Project Cost
- $4,500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.