M STREET S.W. over SOUTH CAPITOL STREET

M STREET & S. CAPITOL · County 001, District of Columbia · Built 1959 · 6 Lanes · 20,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
0011
Year Built
1959
Reconstructed
1988
Length
19.8 m (65 ft)
Max Span
18.9 m
Width
34.1 m (111.9 ft)
Lanes
6
Daily Traffic
20,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.