WEST THOMPSON ROAD over SPILLWAY CHANNEL

3.22 KM NORTH OF PUTNAM · County 015, Connecticut · Built 1965 · 2 Lanes · 3,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
CEPNEDCT0910001
Year Built
1965
Length
34.8 m (114.2 ft)
Max Span
34.8 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
3,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Corps of Engineers (Civil)
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$10,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.