INTERSTATE-395 NB over BALLARD ROAD

1 MILE NORTH OF ROUTE 44 · County 015, Connecticut · Built 1965 · 2 Lanes · 12,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
03068
Year Built
1965
Reconstructed
1993
Length
32.9 m (107.9 ft)
Max Span
15.2 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
12,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.