SULLIVAN DRIVE over EAST RIVER

550 FT EAST OF GOOSE LANE · County 009, Connecticut · Built 2004 · 2 Lanes · 53 vehicles/day

Overall
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
06849
Year Built
2004
Length
13.4 m (44 ft)
Max Span
12.8 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
53
Material
Concrete
Design
Arch - Deck
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.