SAW MILL ROAD over WEST RIVER

425 FT N OF HUBBARD RD · County 009, Connecticut · Built 2021 · 2 Lanes · 369 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
04863
Year Built
2021
Length
21.3 m (69.9 ft)
Max Span
18.9 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
369
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$2,400,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.