US ROUTE 6 over HOP RIVER STATE PK TRAIL

1.06 MI WEST COLUMBIA TL · County 013, Connecticut · Built 2000 · 2 Lanes · 17,100 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
06585
Year Built
2000
Length
13.4 m (44 ft)
Max Span
13.4 m
Lanes
2
Daily Traffic
17,100
Material
Aluminum, Wrought Iron, or Cast Iron
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.