HOP RIVER ROAD over HOP RIVER

.3 MI NORTH OF RTE 6 · County 013, Connecticut · Built 2024 · 2 Lanes · 270 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
04446
Year Built
2024
Length
40.8 m (133.9 ft)
Max Span
20.1 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
270
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$3,425,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.