US ROUTE 7 SB over WOOSTER HEIGHTS ROAD

500 FT FROM DANBURY AP · County 001, Connecticut · Built 2009 · 2 Lanes · 10,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
06569
Year Built
2009
Length
43.6 m (143 ft)
Max Span
41.5 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
10,300
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.