US ROUTE 7 RAMP 47 over SUGAR HOLLOW ROAD

MALL EXIT RTE 7 SOUTHBND · County 001, Connecticut · Built 1987 · 1 Lanes · 10,300 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
05462
Year Built
1987
Length
126.8 m (416 ft)
Max Span
71.6 m
Width
8.5 m (27.9 ft)
Lanes
1
Daily Traffic
10,300
Material
Steel Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.