CROWN STREET over CHURCH STREET TUNNEL

BETWEEN CHURCH & TEMPLE · County 009, Connecticut · Built 1963 · 2 Lanes · 4,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
06535
Year Built
1963
Reconstructed
2017
Length
18.6 m (61 ft)
Max Span
16.8 m
Width
15.1 m (49.5 ft)
Lanes
2
Daily Traffic
4,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.