CHURCH STREET over CHURCH STREET TUNNEL

100 SOUTH OF GEORGE ST · County 009, Connecticut · Built 1963 · 5 Lanes · 15,300 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
06533
Year Built
1963
Length
11.6 m (38.1 ft)
Max Span
10.7 m
Width
36 m (118.1 ft)
Lanes
5
Daily Traffic
15,300
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.