CARTER ROAD over KENT FALLS BROOK

1 MILE EAST OF ROUTE 7 · County 005, Connecticut · Built 2017 · 2 Lanes · 125 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
06153
Year Built
2017
Length
7.5 m (24.6 ft)
Max Span
7.5 m
Lanes
2
Daily Traffic
125
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$2,154,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.