RIVER ROAD over GUINEA BROOK

0.4 MI S. OF ROUTE 4 · County 005, Connecticut · Built 1986 · 2 Lanes · 400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
05362
Year Built
1986
Length
8.8 m (28.9 ft)
Max Span
8.2 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
400
Material
Wood or Timber
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.