ROUTE 150 over QUINNIPIAC RIVER

600 FT E OF ROUTE 15 · County 009, Connecticut · Built 1991 · 2 Lanes · 9,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
06073
Year Built
1991
Length
31.4 m (103 ft)
Max Span
29.6 m
Width
14.8 m (48.6 ft)
Lanes
2
Daily Traffic
9,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.