ROUTE 150 over ROUTE 15

AT EXIT 65 OF ROUTE 15 NB · County 009, Connecticut · Built 1947 · 2 Lanes · 12,200 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
00792
Year Built
1947
Reconstructed
1988
Length
31.7 m (104 ft)
Max Span
14.9 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
12,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.