INTERSTATE-91 NB over ROUTE 75 (POQUONOCK AVE)

4.7 MILES NORTH OF HARTFD · County 003, Connecticut · Built 1991 · 4 Lanes · 62,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
06036
Year Built
1991
Length
56.7 m (186 ft)
Max Span
53.6 m
Width
28.3 m (92.8 ft)
Lanes
4
Daily Traffic
62,100
Material
Steel
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.