ROUTE 305 over INTERSTATE-91 SOUTHBOUND

AT EXIT 37 · County 003, Connecticut · Built 1990 · 4 Lanes · 16,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
06044
Year Built
1990
Length
32.3 m (106 ft)
Max Span
30.5 m
Width
31.5 m (103.3 ft)
Lanes
4
Daily Traffic
16,700
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.