INTERSTATE-91 NB over WESTON STREET

0.2 MILE SOUTH OF EXIT 34 · County 003, Connecticut · Built 1990 · 4 Lanes · 70,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
05866
Year Built
1990
Length
26.5 m (86.9 ft)
Max Span
25.1 m
Width
27.3 m (89.6 ft)
Lanes
4
Daily Traffic
70,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.