INTERSTATE-91 NB over ROUTE 159

300 NORTH OF EXIT 34 NB · County 003, Connecticut · Built 1991 · 4 Lanes · 64,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
05881A
Year Built
1991
Length
50.2 m (164.7 ft)
Max Span
47.9 m
Width
24.2 m (79.4 ft)
Lanes
4
Daily Traffic
64,700
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.