ROUTE 169 over TATNIC BROOK

3 MI NORTH OF ROUTE 14 · County 015, Connecticut · Built 1990 · 2 Lanes · 2,200 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
05857
Year Built
1990
Length
6.7 m (22 ft)
Max Span
3 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
2,200
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.