ROUTE 205 over QUINEBAUG RIVER & CANAL

.5 MILE NORTH OF ROUTE 12 · County 015, Connecticut · Built 1959 · 2 Lanes · 4,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
01543
Year Built
1959
Reconstructed
1988
Length
134.1 m (440 ft)
Max Span
22.4 m
Width
16.3 m (53.5 ft)
Lanes
2
Daily Traffic
4,300
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.