ROUTE 9 NORTHBOUND over MATTABESSET RIVER

1.5 MI SOUTH OF ROUTE 72 · County 007, Connecticut · Built 1988 · 2 Lanes · 32,900 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
05797
Year Built
1988
Length
44.9 m (147.3 ft)
Max Span
42.7 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
32,900
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.