BERLIN STREET over MATTABESSET RIVER
0.8 MI E OF ROUTE 372 · County 003, Connecticut · Built 1981 · 2 Lanes · 1,339 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
41.618903, -72.712836
This bridge is in worse condition than 20.5% of bridges in County 003. The average bridge in Connecticut is 0 years old; this one is 45 years old.
Nearby Bridges
ROUTE 9 SOUTHBOUND over MATTABESSET RIVER
Built 1988
ROUTE 9 NORTHBOUND over MATTABESSET RIVER
Built 1988
BECKLEY ROAD over ROUTE 9
Built 1988
BECKLEY ROAD over SPRUCE BROOK
Built 2012
NORTH ROAD over ROUTE 9 SOUTHBOUND
Built 1988
ROUTE 372 over MATTABESSET RIVER
Built 1933
NORTH ROAD over ROUTE 9 NB & RAMP
Built 1988
INTERSTATE-91 SB over EVERGREEN ROAD
Built 1965
INTERSTATE-91 SB over NORTH ROAD
Built 1965
INTERSTATE-91 NB over EVERGREEN ROAD
Built 1965
Bridge Details
- Structure #
- 05224
- Year Built
- 1981
- Length
- 29 m (95.1 ft)
- Max Span
- 27.4 m
- Width
- 9.7 m (31.8 ft)
- Lanes
- 2
- Daily Traffic
- 1,339
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $519,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.