JELLIFF MILL ROAD over NOROTON RIVER

0.1 MI WEST OF ROUTE 106 · County 001, Connecticut · Built 2018 · 2 Lanes · 1,940 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
05574
Year Built
2018
Length
23.2 m (76.1 ft)
Max Span
21 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
1,940
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$3,496,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.