ROUTE 15 over ROUTE 106

ROUTE 15 EXIT NO. 36 · County 001, Connecticut · Built 1937 · 6 Lanes · 70,400 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00709
Year Built
1937
Reconstructed
1994
Length
14.6 m (47.9 ft)
Max Span
14.6 m
Width
29.2 m (95.8 ft)
Lanes
6
Daily Traffic
70,400
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.