LAUREL LANE over MOUNT HOPE RIVER

.1 MI EAST OF ROUTE 89 · County 013, Connecticut · Built 2013 · 2 Lanes · 6 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
05366
Year Built
2013
Length
25 m (82 ft)
Max Span
24.1 m
Width
6.7 m (22 ft)
Lanes
2
Daily Traffic
6
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.